01629 258300
enquiries@peakengineers.co.uk
Design, detailing and procurement of numerous precast liftshafts at Old Trafford to support the stadium after removal of the original bracing. Required detailed analysis of the cores and localised assessment of the connections between units.
Client
Buckingham Group
Location
Salford
Sector
Commercial
Speak with Our Engineering Experts Today