Working with NHS Trust, Project Management, Architect, Electrical and Services Engineer to design the concrete and civil engineering infrastructure, to facilitate the installation of two back up generators and substations for the hospital expansion project. Included the setting out of the generators, trenches, car park levels, drainage, concrete tunnels and supporting walls across the site, and the access into the building through steps and access points, as well as the concrete detailing and liaising with the site wide groundwork and concrete contractor.